HUB 3 Digester
This renewable natural gas project included building a landfill plant designed to generate 6,000 standard cubic feet per minute (SCFM) of natural gas. The project necessitated the installation of 31 pieces of equipment and the development of an intricate network of interconnecting pipes to efficiently transport gas and ensure seamless operations.
Get In Touch
"*" indicates required fields