Davis Landfill
Market:
Submarket:
This project included the closure of a finished landfill cell and construction of a new one. To adhere to the design specifications of the project and operate efficiently, BHI employed grade-controlled equipment operated via an on-site GPS base station, utilizing a handheld GPS rover to verify equipment calibration and grade accuracy.
Get In Touch
"*" indicates required fields